Can you work with an existing prototype?
Yes. We start by checking whether its architecture, integrations and constraints fit the intended use. Sometimes that turns up work that has to happen before implementation can start.
AI implementation
We build an AI workflow that uses the data and tools you approve, with the access controls, evaluation and operating notes your team needs to run it after we leave.
The work
We start with the job the workflow has to do, who will use it, and what it may read or change. Those three answers drive the integration, the permissions and the tests.
Depending on the workflow, that can mean document retrieval, model and API integration, tool permissions, changes to your application, an evaluation harness and logging. We mark the points where a person has to approve something and confirm the environment we're building for before kickoff.
Deliverables
The working workflow, with its code or configuration changes.
A record of what it reads, what it can do, which controls apply and what we assumed.
Evaluation and test results against the acceptance criteria we agreed.
Deployment or operating notes, the known limitations, and a handover session with the people who will run it.
Before we begin
What the workflow should do, what exists today (a prototype, an architecture sketch), which systems it touches, what kinds of data are involved, any access constraints, and when you need it. Also: who will use it, and who will operate it.
A paragraph or two is plenty for the first conversation. Access, sensitive material and anything that changes production come later, under the engagement terms.
We agree scope, fees, milestones, acceptance criteria and handover before kickoff. Running or maintaining the system afterward is a separate arrangement if you want it.
Scope and limitations
We test the workflow and its agreed risks before handover. A later change to the model, the data or the configuration can change its behavior, so some of those tests will need rerunning. Passing them means the cases we tested behaved; it doesn't mean every weakness has been found.
Because we built the system, our own checks on it are verification. If you need an independent assessment, that has to come from a reviewer who wasn't involved in the build.
Training a foundation model, an organization-wide migration and ongoing managed operation are each separate agreements. We confirm vendor and integration support during the initial review rather than assuming it.
Questions
Yes. We start by checking whether its architecture, integrations and constraints fit the intended use. Sometimes that turns up work that has to happen before implementation can start.
We can, if you want that in scope. The choice follows from the task, the data, the operating environment and your constraints, not from a default vendor.
No. We quote each implementation after we've seen the workflow and integrations. Assessment fees don't include implementation.
An assessment tells you which access risks and controls the prototype has before you spend engineering time on it. Often that's the right order.
Which review fits?Next step
Tell us who uses it, which systems it needs to reach and what we should know before we scope the work.